Retrieving RFP details
Release
Close
California Department of Transportation
Const bridges, RW, SW, overlay, replace slabs, modify elect systems.
California Department of Transportation
Replace culverts, cold plane AC pavement and overlay with HMA.
Susquehanna Area Regional Airport Authority
The work generally consists of the replacement of existing passenger boarding bridges at the Airport. The construction scope of work includes, but is not limited to the following work items: Installation of Temporary Construction Items; Removal of Existing Passenger Boarding Bridges (PBB); Installation of the proposed PBB and ancillary equipment; Remove existing PC Air/400Hz Equipment from existing PBB and install on New PBB; Final adjustments (including commissioning and acceptance).
City of Elk City
Demolition of motel buildings and slabs. Removal of motel buildings, signs, parking lots, slabs, foundations and swimming pool. Clean all debris and provide needed dirt to fill and flatten parcels and leave an easily maintainable area.
Release
Aug 18, 2025
Close
Nov 18, 2025