City of Portland
The conduit 3 ovality repair and venturi meter removal projects involve the construction of water improvements includes 375 SY subgrade geotextile, 100 CY rock excavation, 2,695 ton water pipe zone bedding backfill, 260 LF 4" pipe HDPE DR9 bedding type water pipe zone bedding and backfill, 71 LF 58" steel pipe, 148 LF 72" steel pipe, 2 EA 72" to 58" steel reducer, 1 LS abandoning steel pipe, 1 LS fire suppression water, 10 EA truck liners, 130 CY exploratory excavation, 623 ton water pipe zone material, 135 LF 4" HDPE DR9 bedding type water pipe zone bedding and backfill, 1 LS corrosion control.
bulk
zip
Release
Sep 04, 2024
Close
Oct 17, 2024