Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of California City
Project includes installation of a 1134 SF wet area, 4"thick minor concrete splash pad slab, to be reinforced with wire mesh or rebar, and minor grading.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Santa Ana
Construction of a new splash pad at portola park. The splash pad will include a variety of water features and outdoor showers for public use. The site will need to be graded, all mechanical, electrical, and plumbing scope will need to be installed, concrete will need to be poured, shade structures are to be constructed, and the water features/ showers are to be installed. All underground work to ensure the splash pad is functional are considered part of the project scope. In addition to the splash pad, the existing restroom will be renovated to improve the structure, ADA compliance and to add a room to house the splash pad equipment. This work will include structural, mechanical, electrical, and plumbing to complete. All equipment for the splash pad are to be installed in the new room and connected to the splash pad. Construction of new walls and replacing the existing roofing will be needed to enclose the new splash pad equipment room. The existing restrooms will be renovated to demolish the existing fixtures and install new ADA compliant fixtures.
Posted Date
Dec 26, 2025
Due Date
Dec 18, 2025
Release: Dec 26, 2025
City of Santa Ana
Close:
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Construction of a new splash pad at portola park. The splash pad will include a variety of water features and outdoor showers for public use. The site will need to be graded, all mechanical, electrical, and plumbing scope will need to be installed, concrete will need to be poured, shade structures are to be constructed, and the water features/ showers are to be installed. All underground work to ensure the splash pad is functional are considered part of the project scope. In addition to the splash pad, the existing restroom will be renovated to improve the structure, ADA compliance and to add a room to house the splash pad equipment. This work will include structural, mechanical, electrical, and plumbing to complete. All equipment for the splash pad are to be installed in the new room and connected to the splash pad. Construction of new walls and replacing the existing roofing will be needed to enclose the new splash pad equipment room. The existing restrooms will be renovated to demolish the existing fixtures and install new ADA compliant fixtures.
AvailableCity of Rockwall
DESIGN-BUILD. Providing demolition of existing splash pad and a splash pad design and installation in connection with harry myers park splash pad. project is for the design and installation of an approximately 4,000 square feet facility area including seating area with sidewalk border around the splash pad with an approximate 2,000 SY splash pad
Posted Date
Dec 4, 2025
Due Date
Dec 22, 2025
Release: Dec 4, 2025
City of Rockwall
Close: Dec 22, 2025
DESIGN-BUILD. Providing demolition of existing splash pad and a splash pad design and installation in connection with harry myers park splash pad. project is for the design and installation of an approximately 4,000 square feet facility area including seating area with sidewalk border around the splash pad with an approximate 2,000 SY splash pad
AvailableCity of Fayetteville
Purchase and installation of a vortex aquatic splash pad at park.
Posted Date
Dec 1, 2025
Due Date
Dec 16, 2025
Release: Dec 1, 2025
City of Fayetteville
Close: Dec 16, 2025
Purchase and installation of a vortex aquatic splash pad at park.
AvailableCity of Fort Collins
Renovation and modernization of the community park splash pad, including demolition, mechanical system replacement, flatwork, utilities, and associated architectural and structural improvements. Landscape and irrigation installation and planting restoration.
Posted Date
Nov 24, 2025
Due Date
Jan 9, 2026
Release: Nov 24, 2025
City of Fort Collins
Close: Jan 9, 2026
Renovation and modernization of the community park splash pad, including demolition, mechanical system replacement, flatwork, utilities, and associated architectural and structural improvements. Landscape and irrigation installation and planting restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →