Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Columbia
Parkway sidewalk.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Columbia
The City of Columbia, Missouri is soliciting competitive sealed bids for construction of the Columbia Gorge Parkway Sidewalk, including mobilization, grading, removal and replacement of unsuitable material, reinforced concrete sidewalks and ramps, ADA detectable warning panels, curb and gutter, signage, erosion and traffic control, and site restoration. The contract requires completion within the project timeframe specified in the solicitation and the response deadline is Dec. 19, 2025.
Posted Date
-
Due Date
Dec 19, 2025
Release: -
City of Columbia
Close: Dec 19, 2025
The City of Columbia, Missouri is soliciting competitive sealed bids for construction of the Columbia Gorge Parkway Sidewalk, including mobilization, grading, removal and replacement of unsuitable material, reinforced concrete sidewalks and ramps, ADA detectable warning panels, curb and gutter, signage, erosion and traffic control, and site restoration. The contract requires completion within the project timeframe specified in the solicitation and the response deadline is Dec. 19, 2025.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Blue Ridge Parkway Foundation
Provide consultant to utilize a Geographic Information System (GIS) to guide viewshed analysis and conservation along the 469-mile Blue Ridge Parkway.
Posted Date
Nov 10, 2025
Due Date
Dec 8, 2025
Release: Nov 10, 2025
Blue Ridge Parkway Foundation
Close: Dec 8, 2025
Provide consultant to utilize a Geographic Information System (GIS) to guide viewshed analysis and conservation along the 469-mile Blue Ridge Parkway.
AvailableTown of Wakefield
Reconstruction of 3,600 LF of ADA-Compliant Sidewalk. Removal and proper disposal of existing sidewalk, curb, and gutter where required. Reconstruction of approx. 3,600 LF of ADA-compliant sidewalk (width per local standards, typically 5 feet minimum). Construction of new curb ramps, detectable warning surfaces, and transitions at driveways and intersections per ADA guidelines. Adjustment of utilities (manholes, valve boxes, etc.) to grade as necessary. Restoration of disturbed areas including landscaping, turf, or pavement. Coordination with local utility providers and municipal departments. Traffic control and flagging per [MUTCD] standards. All permitting and inspections required by local jurisdiction. Compliance with stormwater, erosion, and sediment control requirements.
Posted Date
Nov 7, 2025
Due Date
Jan 30, 2026
Release: Nov 7, 2025
Town of Wakefield
Close: Jan 30, 2026
Reconstruction of 3,600 LF of ADA-Compliant Sidewalk. Removal and proper disposal of existing sidewalk, curb, and gutter where required. Reconstruction of approx. 3,600 LF of ADA-compliant sidewalk (width per local standards, typically 5 feet minimum). Construction of new curb ramps, detectable warning surfaces, and transitions at driveways and intersections per ADA guidelines. Adjustment of utilities (manholes, valve boxes, etc.) to grade as necessary. Restoration of disturbed areas including landscaping, turf, or pavement. Coordination with local utility providers and municipal departments. Traffic control and flagging per [MUTCD] standards. All permitting and inspections required by local jurisdiction. Compliance with stormwater, erosion, and sediment control requirements.
AvailableForest Service
Provide Rocky Gorge Path Storm Repair.
Posted Date
Jul 25, 2025
Due Date
Aug 1, 2026
Release: Jul 25, 2025
Forest Service
Close: Aug 1, 2026
Provide Rocky Gorge Path Storm Repair.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →