Retrieving RFP details
Release
Close
California Department of Transportation
Work consists of cold plane ac pavement, rhma-g & hma overlay, replace ac surf, & mgs. Work includes, 21,000 LF of temporary fiber roll; 150,000 LF of remove yellow thermoplastic traffic stripe (hazardous waste); 55 CY of wood mulch; 322,000 SF of hydromulch; 22,200 LF of fiber rolls; 205,000 sf of incorporate materials; 420 CY of rapid strength concrete base; 620 SY of base bond breaker; 14,800 TON of hot mix asphalt (type a); 80,700 TON of rubberized hot mix asphalt (gap graded); 212,000 SY of geosynthetic pavement interlayer (paving grid); 890 LF of place hot mix asphalt dike (type d); 4,470 LF of place hot mix asphalt dike (type e); 659,000 SY of cold plane asphalt concrete pavement; 13,300 LF of midwest guardrail system; 11,200 LF of remove guardrail; 29,300 SF of thermoplastic pavement marking (enhanced wet night visibility); 274,000 LF of 6" thermoplastic traffic stripe (enhanced wet night visibility). See attached files.
Cold Plane AC Pavement, RHMA-G & HMA Overlay, Replace AC Surf, & MGS
zip
California Department of Transportation
Replace culverts, cold plane AC pavement and overlay with HMA.
California Department of Transportation
Cold plane AC surfacing & RHMA/HMA overlay, signal and lighting.
California Department of Transportation
RHMA (Gap Graded), HMA and cold plane asphalt concrete pavement.
Release
Oct 13, 2025
Close
Dec 04, 2025