Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
National Guard Bureau (NGB)
Work includes cleaning roadway drainage structures, including grated and wall drains, as well as performing pipe cleaning for various pipe diameters and heavy drain cleaning as needed. The project also includes implementing traffic control measures with lane closures and callout lane closures to safely manage traffic during maintenance operations.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
National Guard Bureau (NGB)
Work includes cleaning and maintenance of drainage systems, including trench drains, grates, wall drains, and pipes of various diameters, as well as performing heavy drain cleaning as needed. Traffic control will be provided through lane closures and callouts to ensure safe work zones during maintenance operations.
Posted Date
-
Due Date
Dec 5, 2025
National Guard Bureau (NGB)
Close: Dec 5, 2025
Work includes cleaning and maintenance of drainage systems, including trench drains, grates, wall drains, and pipes of various diameters, as well as performing heavy drain cleaning as needed. Traffic control will be provided through lane closures and callouts to ensure safe work zones during maintenance operations.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
National Guard Bureau (NGB)
Work includes cleaning existing drainage systems, including trench drains, wall drains, and drains with grates. The project also involves cleaning pipes less than 18 inches and those 18 inches or greater in diameter, as well as performing heavy drain cleaning where required. Traffic control operations will include lane closures and callout lane closures to safely facilitate the cleaning activities.
Posted Date
-
Due Date
Dec 5, 2025
Release: -
National Guard Bureau (NGB)
Close: Dec 5, 2025
Work includes cleaning existing drainage systems, including trench drains, wall drains, and drains with grates. The project also involves cleaning pipes less than 18 inches and those 18 inches or greater in diameter, as well as performing heavy drain cleaning where required. Traffic control operations will include lane closures and callout lane closures to safely facilitate the cleaning activities.
AvailableNational Guard Bureau (NGB)
Work includes cleaning of drains with grates, wall drains, and pipes of various diameters, performing heavy drain cleaning, and implementing lane closures including standard lane closures and callout lane closures for traffic management.
Posted Date
-
Due Date
Dec 5, 2025
Release: -
National Guard Bureau (NGB)
Close: Dec 5, 2025
Work includes cleaning of drains with grates, wall drains, and pipes of various diameters, performing heavy drain cleaning, and implementing lane closures including standard lane closures and callout lane closures for traffic management.
AvailableCity of San Antonio
For mud sump service, drain line cleaning, oil/water separator service and waste disposal. This service shall include removal, transportation and disposal of the waste, and cleaning of septic tanks, grit tanks, storm lift stations, sewer lift stations, sand oil separators, grit traps and grease traps at various locations throughout the city.
Posted Date
Oct 17, 2025
Due Date
Dec 8, 2025
Release: Oct 17, 2025
City of San Antonio
Close: Dec 8, 2025
For mud sump service, drain line cleaning, oil/water separator service and waste disposal. This service shall include removal, transportation and disposal of the waste, and cleaning of septic tanks, grit tanks, storm lift stations, sewer lift stations, sand oil separators, grit traps and grease traps at various locations throughout the city.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →