Retrieving RFP details
Release
Close
City of Madison
New potable water booster pumping station. Skid-mounted booster pumping station (pre-purchased by Owner). Booser pumping station building construction. Booster pumping station water piping and connections. Booser pumping station natural gas generator and service line. Booster pumping station miscellaneous site work. 500 LF 8" ductile Iron water main. Electrical construction. SCADA construction.
City of Hamilton
Purchase and delivery of a pre-fabricated water booster pumping station. This is an american-made products project.
City of Forsyth
Schedule 1 - water mains: +/-590 LF of 8" PVC water main and +/-220 of 6" PVC fire / water service pipe installed via open-cut methods and an additional +/-320 LF of 8" HDPE water main installed by horizontal directional drilling methods. Work will include typical water main appurtenances including, but not limited to, fire hydrants, gate valves, fittings, and surface restoration. Schedule 1 will also include the installation of a prefabricated pressure reducing valve vault west of quincer subdivision and removal an existing pressure reducing valve vault located in riverview villa subdivision. The work will require the handling and disposal of asbestos containing pipe. The work shall be substantially completed by friday, june 26, 2026. qualifications: contractor(s) implementing trenchless technologies via horizontal directional drilling methods shall furnish written evidence of experience in performing said portion of work. Schedule 2 - pumping station: upgrading of an existing water booster station into a water pumping station. Work will include, but not limited to; removal of existing pipe, appurtenances, equipment, wall furnishings, and electrical within the existing building and replacing with all new pumps, interior piping, appurtenances, equipment, electrical, and SCADA control systems, and interior wall coverings and finishes. New interior piping, appurtenances, and equipment may be prefabricated in sections or built-in-place. The work will require temporary pumping and water supply to the riverview villa subdivision currently serviced by the existing booster station during the course of construction. The work shall be substantially completed by Friday, June 26, 2026.
Erie City Water Authority
Provide general/mechanical and electrical construction for the improvements to the booster pump station.
Release
Oct 09, 2025
Close
Nov 06, 2025