Retrieving RFP details
Release
Close
City of Redondo Beach
Work includes 2140 SF 2" cold mill, 26 Ton asphalt (c2-pg 64-10), 1284 SF dig-out - remove existing and replace with ac and barrier, 1136322 SF slurry seal modified type II with 2.5% latex rubber modifier with carbon black additive over ac pavement including crack sealing for cracks greater than 1/4", 75 LF remove existing asphalt concrete berm, 50 LF install asphalt concrete berm. See attached file.
City of Ontario
Maintenance slurry seal and pavement management.
City of La Quinta
The project consist of furnishing and applying slurry seal on select streets with in the city. The proposed work includes, but is not limited to, weed removal, header cuts, application of crack sealant, removal of existing striping, grinding, asphalt overlay, application of Type II Latex Emulsion Aggregate Slurry Seal, and re-striping slurried streets.
City of Garden Grove
Furnish all Labor, Material, Tools, Equipment and Incidentals for 2026 On-Call Reclaimed Asphalt Pavement (RAP) Slurry Seal and Asphalt Cold Mix.
Release
Oct 23, 2025
Close
Dec 04, 2025