Retrieving RFP details
Release
Close
City of Oxnard
Work to remove and dispose of the play area equipment, equipment footings, rubber tile surface and subsurface concrete base/slab and the supply of and installation of new corrosion resistant nautical themed playground equipment and pour in place rubberized surface for the 2 5-year playground area.
PW 26-20
City of Oxnard
Dispose of existing playground equipment and replace with a new playground system and installation of new engineered wood fiber safety surfacing.
City of Lomita
This project consists of the removal and replacement of existing playground equipment and rubberized surfaces.
City of Watertown
Work consists of How Park Phase 1 Playground Renovations.
Release
Oct 22, 2025
Close
Nov 18, 2025