Retrieving RFP details
Release
Close
City of Tulsa
Infrastructure rehabilitation & improvements. Work includes 750 SY of concrete sidewalk; 1,000 SY of clearing and grubbing; 3,000 CY of unclassified excavation; 75 CY of rock excavation; 5,000 SY of bermuda solid slab sodding; 20 SY of seeding; 500 LF of crack sealing; 1,000 SY of cold milling; 500 SY of novachip overlay; 10 CY of pressure grouting; 1,000 SF of versa-lok retaining wall; 50 SY of steel sheet piling; 2,500 LF of combined curb and gutter; sidewalk ramp; 2 EA precast concrete manhole; 500 SF of masonry brick and stone repair; 80 LF of 15" CL III RCP pipe; 80 LF of 18" CL III RCP pipe; 80 LF of 21" CL III RCP pipe; 20,000 LF of sawing pavement; 100 LF of W-beam single beam guard rail; 100 LF of 48" high chain link fence; 100 LF of 72" high chain link fence; 100 LF of 15" corrugated polypropylene pipe; 100 LF of 18" corrugated polypropylene pipe; 100 LF of 21" corrugated polypropylene pipe; 100 LF of 54" corrugated polypropylene pipe; pavement striping; 40 LF of 6" SDR26 PVC pipe. See attached files for complete scope of work.
Citywide Infrastructure Rehabilitation & Improvements
zip
Pinedale Water Sewer And Fire Protection Authority
The project consists of making improvements to the water distribution infrastructure to include construction of an elevated water storage tank, booster pumping station, and a new purchase meter connection
Chicago Public Schools
Work consists of electrical infrastructure improvements.
City of Margate
Provide citywide canal bank restoration/stabilization includes a complete turnkey installation of embankment slope stabilizers as well as complete property restoration to better than existing. It is intended that the canal embankment improvements be completed using geosynthetic slope stabilization with a modular open containment system made up of two (2) layers of virgin pre-recycled (food grade) high density polyethylene (hdpe), that is constructed with a knitted pattern.
Release
Oct 17, 2025
Close
Nov 07, 2025