Retrieving RFP details
Release
Close
City of Corona
Removal of existing non-compliant curb ramps and installation of new ADA-compliant curb ramps, as well as the construction of additional ramps where barriers currently exist. All new curb ramps will be built to meet the latest ADA requirements and applicable City, County, and State standards, ensuring safe and accessible pedestrian routes.
Citywide ADA and Sidewalk Improvements Program
zip
City of Bridgeport
Work includes per CY excavation, disposal; per SF 8" concrete driveway apron; per SF 5" concrete sidewalk with wire mesh; per SF brick sidewalk on concrete base; per LF granite curb 5" x 18"; per LF reset existing granite curb ; per SF permanent pavement repair; per EA tree gate installed; per EA tree pit includes tree; per sf 3' wide grass strip; per LF 18" concrete sidewalk curb; per LF 12" concrete driveway curb; per EA trash receptacle; per EA sidewalk bench; per LF 1' dia PVC conduit; per LF 1' diameter rigid metal conduit; per ea standard light & foundation, per ea street light cable & electrical service. See outside link.
City of Pomona
Citywide ADA curb ramps and path work.
City of Palmdale
Work includes : sitework grading, survey, PCC sidewalk, PCC curb and gutter, PCC cross gutters and spandrels, PCC handicap ramps, transition paving.
City of Mobile
Work includes construction of curb ramps and sidewalk improvements.
Release
Sep 25, 2025
Close
Oct 30, 2025