City of Pico Rivera
Work includes, 26,000 SF, Cold Mill Existing AC Pavement 1.5" (Uniform Thickness). 123,000 SF, Cold Mill Existing AC Pavement 2.5" (Uniform Thickness). 209,200 SF, Cold Mill Existing AC Pavement 3" (Uniform Thickness). 18,900 SF,Cold Mill Existing AC Pavement 4" (Uniform Thickness). 1,360 TN, Construct Temporary AC Pavement (Thickness per Plan) at dig-outs, prior to final milling. 3,150 TN, Construct ARHM Overlay (Thickness per Plan) on Ave. 1,950 TN, Construct ARHM Overlay (Thickness per Plan) on Local Streets. 2,030 TN, Construct AC Base Overlay (Thickness per Plan). 34,730 SY, Construct Cape Seal. See outside link.
Release
Jul 25, 2024
Close
Sep 18, 2024