Retrieving RFP details
Release
Close
City of Wooster
Work includes demolition of the existing swimming pool and parking lot and the construction of a new swimming pool, parking lot, and associated utilities includes 4,930 SY of asphalt pavement removal; 463' of curb removal; 2,945 SY of pool and deck removal; 1,000 CY of excavation; 3,346 SF of 4" concrete walk; 317' of curb, type 6; 384' of 12" conduit, type b 706. 02; 163' of 6" di pipe; 8,715 SY of seeding & mulching; 1,328 SF of segmental block retaining wall; 1,152 SF of shelter pads; 42,812 SF of asphalt paving. See attached files.
City of Wooster - Christmas Run Pool Improvements
zip
Butler County
Repairs and replacement to the existing pool deck, installation of a new pool liner, demolition of old mechanical building, construction of new mechanical building, installation of pool discharge management, construction of gravel parking lot, construction of upgraded mechanical and plumbing equipment, new pool amenities, new electrical service, and other site improvements. Alternative bids are also being received for new UV treatment, replacement of the pool slide, and asphalt paving of the proposed parking lot. The project has received funding from the Pennsylvania Department of Conservation and Natural Resources (DCNR) through the Community Conservation Partnerships Program (C2P2).
Town of Walpole
Project consists of pool improvements. See outside link.
Enoch Pratt Free Library
Design-build project to include – replacing all of the windows; replacing the main entrance storefront, vestibule and doors; replacing the main entrance canopy; replacing secondary exterior doors and associated frames; connecting all doors included as part of the existing access control and security systems; cleaning and repairing the retaining walls at the front of the building; cleaning all concrete walks and ramps; repairing or replacing all damaged concrete walks and ramps; repairing or replacing all railings, and guardrails; installing new bike racks; making improvements to the plaza/courtyard on the south side of the building to include new landscaping and exterior furniture; installing new exterior lighting; cleaning the south elevation; repaving and restriping the staff parking lot; and installing a new landscaping solution. See attached file and outside link.
Release
Oct 30, 2025
Close
Nov 20, 2025