Retrieving RFP details
Release
Close
City of Live Oak
Maintenance Garage Roof Replacement.
Michigan Department of Technology, Management and Budget
Work include roof recovery at existing low slope pvc roof assembly (sections a & b) with new recovery insulation and epdm membrane, including all associated flashings. Includes removal and replacement of primary roof drains.
City of Miamisburg
The service garage project includes the removal of the existing roof system down to the metal deck, replacement of insulation and membrane materials, and installation of a new fully adhered 60-mil fleece back kee roofing system meeting nrca and manufacturer standards for 120 mph wind uplift. The salt barn project includes removal of all existing roofing materials, skylights, and flashings; replacement of any deteriorated decking; infill of skylight openings with new decking; installation of new underlayment, drip edge, flashings, and a new 30-year rated architectural shingle system.
Borough of Fairchance
Work include full shingle roof replacement on the municipal garage.
Release
-
Close
Nov 18, 2025