Retrieving RFP details
Release
Close
City of Wichita
Replace nine (9) chilled water pumps plus associated piping and valves. Remove and replace 9 split-coupled vertical in-line pumps: 800-ton chiller (condenser side): 1 pump - series 4300, 10x10x13, 75hp; 800-ton chiller (evaporator side): 2 pumps; 400-ton chiller (condenser side): 2 pumps - series 4300, 8x8x10, 30hp; 400-ton chiller (evaporator side): 2 pumps; secondary chilled water system: 2 pumps. Replace 18 isolation butterfly valves: 8 x 10" valves; 8 x 8" valves; 2 x 12" valves. Supply, install, and modify electrical service and components as needed for pump operation. Insulate all chilled water pumps, valves, specialties, and associated piping. See outside link.
Clark County
Provide Chilled Water Pump, Chiller Valve & Condenser Water Strainer Replacement
Sanitation Districts Of Los Angeles County
The project involves the replacement of the existing chilled water plant, which includes: replacement of three existing chillers, two existing chilled water pumps, and two condenser water pumps; replacement and modification of piping, valves, and supports; installation of a new chiller plant control system; replacement of chiller plant instrumentation; electrical conduits, conductors, panels, and ductbanks; installation of variable frequency controllers; modification of existing switchgear; and replacement of equipment pads. The project also includes modifications to campus chilled water piping, replacement of air handler chilled water control valves, demolition of existing booster pumps, and upgrading the existing building automation system (bas).
257-Network Contract Office 17 (36C257)
Replace Chilled Water Pump and VFD #4.
Release
Oct 16, 2025
Close
Nov 21, 2025