Inland Empire Utilities Agency
Work includes removal and disposal of old cooling tower; removal and disposal of two cooling tower water pumps; removal and disposal of water filtration systems; removal and disposal of associated piping, supports, controls, and electrical equipment; demolition of related structural pads and pedestals; installation of new two-cell cooling towers to connect in parallel with the new existing cooling tower; installation of three new cooling tower water pumps; installation of new control panels for equipment and VFDs with side mounted air conditioning units.
Release
Oct 01, 2024
Close
Oct 31, 2024