Kenai Peninsula Borough
Project includes constructing a building to house a new leachate evaporator, new mechanical pump building, installing and plumbing of new pumps and piping in the existing mechanical building, assembly of the new evaporator system, electrical, gas upgrades, various site improvements, and the installation of a fire water tank located near the existing maintenance building.
Release
Aug 22, 2024
Close
Sep 19, 2024