Retrieving RFP details
Release
Close
Pickens County School District
Project is for sitework improvements to the main parking lot, student drop-off loop and off-site scdot roadway improvements. The work to bid will include but not limited to: clearing, grading/earthwork, demolition, storm drainage, erosion control, paving, sidewalks, site lighting, etc.
San Jose-Evergreen Community College District
Project include selective removal and replacement of parking area surfaces and adjacent walkways, detectable surfaces, parking stall signage/striping, door thresholds at (2) existing doors in the general education building (ge) and relocation of the existing fire hydrant.
Eugene School District 4J
Seismic improvements to the structure of the main gym at ATA, along with associated removal and patching of finishes required for the installation of structural work. The project also includes installation of new roofing over the existing roof and associated flashing replacement.
Air Force Life Cycle Management Center
Sitework and paving indefinite delivery/indefinite quantity contract.
Release
Oct 07, 2025
Close
Nov 04, 2025