Retrieving RFP details
Release
Close
New Hanover County
Work consist of construction of landfill cells 12b & 13 and the relining of the county's leachate lagoon, site preparation, grading, placement of the liner system, placement of the soil cover systems, associated hauling and perimeter roads, stormwater management systems, leachate collection piping, sump and pumps, electrical and control panels, and rain tarp (bid alternate) with county coordination.
Cell 12b &13 Construction and Lagoon Relining Project
zip
Denton Purchasing and Materials Manager
Provide cell 6 construction project. The major work will consist of the (approx.) following: landfill cell 6 12 excavation, geosynthetic liner construction, 1590 separation liner construction, leachate 13 sump installation and connections, gas well conversion and installation.
Town of Hillsboro
Provide lagoon improvements project.
City of Fernley
The Work consists of performing or providing all labor, services, and documentation necessary to produce such construction and furnishing, installing, and incorporating all materials and equipment into such construction. Work generally include dewatering, sludge drying, removal and disposal, removal of existing HDPE lining system, minor grading, subgrade preparation, and installation of new HDPE lining system for both ponds. Additional ancillary items including but not limited to life buoy stands, anchor trenches, pipe boots, ballast tubes, and escape ladders are also proposed. See outside link.
Release
-
Close
Nov 07, 2025