Goleta Water District
Work includes 1 LS provide temporary pumping facilities; 1 LS demolish existing pump station; 1 LS install instrumentation backboard; 1 ls install new pumps and piping; 1 LS install electrical wires and conduit; 1 LS demolish existing mcc; 1 LS install instrumentation backboard; 1 LS install mcc, electrical wires and conduit; 1 LS test, commission, start-up the sludge bed pump station, and provide red-line; 1 LS test, commission, start-up the sludge bed pump station, and provide red-line. See outside link.
Release
Aug 13, 2024
Close
Sep 16, 2024