Logo

starbridge

Book a Demo
RFPs/Capitol Region Mental Health Center (CRMHC) Energy Audit Implementation Program (ITB)

Capitol Region Mental Health Center (CRMHC) Energy Audit Implementation Program (ITB)

Connecticut Office of the Attorney General

Summary

Implement the following energy reduction and conservation measures at the building : replacement of the two (2) existing cast iron hot water boilers with high-efficiency gas-fired condensing boilers. New boilers will have dual-fuel (gas/lp) capability; demolition of the existing #2 fuel oil system, including existing buried fuel oil tan; installation of new liquid propane (lp) storage tanks, piping and accessories; replacement of existing heating and ventilation (h&v) units hv-1 and hv-2 with a new 100% outside air rooftop unit (rtu); replacement of existing domestic hot water heater with new high-efficiency unit(s; installation of infrared sensor control of existing kitchen exhaust fan.

Files

bulk

zip

Details

Release

Jul 18, 2024

Close

Oct 16, 2024

Contacts

Source

Get a Free RFP Download