Texas State Technical College System
The project involves renovating 7,640 SF on the first and third floors. The first level area of scope encompasses 2,205 SF, and the scope in the third level includes 5,435 SF; the latter is located in two separate building areas.
Capital Construction Assistance Projects (CCAP) Renovation At TSTC in Hutto (RFP)
zip
Release
Jan 31, 2025
Close
Feb 21, 2025