Logo

starbridge

Book a Demo
RFPs/Cafeteria Refrigeration Replacement System (Request For Quotes)

Cafeteria Refrigeration Replacement System (Request For Quotes)

US Drug Enforcement Administration

Summary

A requirement to replace the cafeteria refrigeration system at the office of training. The existing one (1) multi zone condensing unit that incorporates four separate refrigeration systems/zones is to be removed and replaced with one new multi zone condensing unit that incorporates three (3) separate refrigeration systems/zones matching existing requirements The new condenser unit shall be 3 phase 208-230-volt power to utilize the existing utilities onsite. BOHN: TPC2 -208-230V 3Ph Flex Pack Condensing Unit .

Files

No files

Details

Release

Aug 29, 2024

Close

Sep 13, 2024

Contacts

Source