Retrieving RFP details
Release
Close
Da Vinci Schools
Renovation of the existing entry cafe which includes all construction and services required to renovate the existing cafe space, remove and replace all finishes (i.e., flooring, ceiling, wall), install cafe equipment and appliances, provide pony stud wall partitions, countertops, as well as mept appurtenances. Modifications of existing fire alarm and fire suppression will be required, plus installation of staff lockers and shelving at the dry storage room and other associated improvements
AntFarm Youth Services
Antfarm estacada cafe and resource center project.
Wiseburn Unified School District
Work consists of renovation of the existing entry cafe which includes all construction and services required to renovate the existing cafe space, remove and replace all finishes (i. E. , flooring, ceiling, wall), install cafe equipment and appliances, provide pony stud wall partitions, countertops, as well as MEPT appurtenances.
636A6-Central Iowa Health Care
Renovate 1st floor/dock/180 for kitchen & cafe. Refresh Design and CPS.
Release
Oct 06, 2025
Close
Nov 04, 2025