1 acr supplementary clearing & grubbing; 2,150 cy undercut excavation; 180 cy drainage ditch excavation; 2,100 cy select granular material; 2,100 sy geotextile for soil stabilization; 100 ton generic grading item; hauling and disposal of petroleum contaminated soil; 305 ton foundation conditioning material, minor structures; 955 sy foundation conditioning geotextile; 28 lf 18" drainage pipe; 24 lf ****" rc pipe culverts, class iv (12"); 1,904 lf 15" rc pipe culverts, class iv. See attached file for full scope.
November Invite
North Carolina Department of Transportation
Lump sum ls grading; 1 acr supplementary clearing & grubbing; 450 cy undercut excavation; 200 sy geotextile for soil stabilization; 50 ton generic grading item; hauling and disposal of petroleum contaminated soil; 1,179 ton foundation conditioning material, minor structures; 4,662 sy foundation conditioning geotextile; 8 lf **" cs pipe culverts, *****" thick (12", 0. 064"); 1,637 lf pipe removal; 2,100 cy shallow undercut; 4,400 ton class iv subgrade stabilization; 250 ton stabilizer aggregate; 6,950 sy geotextile for subgrade.
North Carolina Department of Transportation
Lump sum ls mobilization; lump sum ls construction surveying; 1 acr supplementary clearing & grubbing; 200 cy undercut excavation; lump sum ls grading; 1,400 cy borrow excavation; 200 cy select granular material; 200 sy geotextile for soil stabilization; lump sum ls generic grading item; type 1 bridge approach fill, station 22+08 -l-; 50 ton generic grading item hauling and disposal of petroleum contaminated soil; 40 ton foundation conditioning material, minor structures; 120 sy foundation conditioning geotextile; 188 lf 15" drainage pipe. See attached file for full scope.
North Carolina Department of Transportation
Lump sum ls construction surveying; lump sum ls clearing & grubbing. . Acre(s); 1 acr supplementary clearing & grubbing; 1 ea sealing abandoned wells; 87,500 cy unclassified excavation; 4,780 cy undercut excavation; 2,665 cy drainage ditch excavation; 110 lf berm ditch construction; 6,310 sy removal of existing asphalt pavement; 600 sy breaking of existing asphalt pavement; 2,500 cy select granular material; 3,900 sy geotextile for soil stabilization; 24,720 sf temporary shoring; 6,000 sy rock plating; 300 sy generic grading item soil nail slope stabilization; lump sum ls generic grading item type 1 bridge approach fill, station 27+24. 00 -l-; 250 ton generic grading item hauling and disposal of petroleum contaminated soil. See attached file for full scope.