Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Missouri Office of Administration
The State of Missouri Office of Administration is seeking bids to upgrade the diesel-engine-driven generator control system and transfer switch and associated supporting equipment and building modifications at Moberly Correctional Center. Project documents are distributed via the OA FMD online planroom (documents available for purchase or refundable hard-copy deposit); a pre-bid meeting is scheduled and bids are due 2025-12-04.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Missouri Office of Administration
The project consists of upgrading the existing diesel-engine-driven generator control system and transfer switch at the Power Plant including the associated supporting equipment and building modifications.
Posted Date
Oct 10, 2025
Due Date
Dec 4, 2025
Release: Oct 10, 2025
Missouri Office of Administration
Close: Dec 4, 2025
The project consists of upgrading the existing diesel-engine-driven generator control system and transfer switch at the Power Plant including the associated supporting equipment and building modifications.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
West Baton Rouge Parish
Provide one (1) new standby natural gas generator system with automatic transfer switch (ATS) to include the generator, connection to electrical controls, connection to the natural gas system, testing, adjusting, and start-up.
Posted Date
Nov 13, 2025
Due Date
Dec 2, 2025
Release: Nov 13, 2025
West Baton Rouge Parish
Close: Dec 2, 2025
Provide one (1) new standby natural gas generator system with automatic transfer switch (ATS) to include the generator, connection to electrical controls, connection to the natural gas system, testing, adjusting, and start-up.
Available252-Network Contract Office 12 (36C252)
Provide upgrade facility generator controls construction. This project includes upgrading the control system for three (3) Cummins 1250kW diesel powered generators. This entails installing modernized PCC3.3 Controllers at each generator, replacing the legacy Digital Master Controller (DMC) with Cummins modern DMC 8000, and installing new control wiring to the MV switchgear. A temporary 480V generator (1000kW minimum) and 480V/13.8kV step up transformer will be needed to maintain backup power availability to the Facility. See attached file.
Posted Date
Nov 17, 2025
Due Date
Dec 1, 2025
Release: Nov 17, 2025
252-Network Contract Office 12 (36C252)
Close: Dec 1, 2025
Provide upgrade facility generator controls construction. This project includes upgrading the control system for three (3) Cummins 1250kW diesel powered generators. This entails installing modernized PCC3.3 Controllers at each generator, replacing the legacy Digital Master Controller (DMC) with Cummins modern DMC 8000, and installing new control wiring to the MV switchgear. A temporary 480V generator (1000kW minimum) and 480V/13.8kV step up transformer will be needed to maintain backup power availability to the Facility. See attached file.
AvailableTexas Health and Human Services Commission
Installation of a new automatic transfer switch. The Contractor shall complete the removal of the existing 600-amp automatic transfer switch (ATS) that is out of services and connect a new 600-amp ATS.
Posted Date
Nov 17, 2025
Due Date
Dec 3, 2025
Release: Nov 17, 2025
Texas Health and Human Services Commission
Close: Dec 3, 2025
Installation of a new automatic transfer switch. The Contractor shall complete the removal of the existing 600-amp automatic transfer switch (ATS) that is out of services and connect a new 600-amp ATS.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.