Retrieving RFP details
Release
Close
City of Pasco
Installation of a vault around an existing raw water pipe, two taps on aforementioned pipe, and ancillary instruments within the vault. Relocation of an existing Conex, followed by trenching and installation of yard piping between the vault and Conex. Installation of a permanganate storage and feed systems, a raw water sample panel, ventilation, and ancillary equipment within the Conex. A new PLC shall be finished and installed. Programming and integration of new permanganate system, raw water quality analyzers and intrusion sensor for vault.
City of Dania Beach
Work includes water treatment plant chemical feed system replacement involves three sections of the water treatment plant: the membrane filtration system, the disinfection process of the raw water supply, and the control boxes for the four-gravity fed multi-layer media filters after the softening process.
City of Bloomington
Water Treatment Plant - CO2 Pressurized System.
City of Foley
Work consists principally of approx 5,600 LF of 12” PVC/FPVC water main, approx 700 LF of HDPE encasementand associated appurtenances installed by open cup and HDD. Sand or sand-clay baxckfill 7900 cyip, silt fence 3200 lf, wattles 380 lf, traffic control 1 ls, 12" pvc water main 3890 lf, 12" fusible pvc water main HDD 560 lf, 12" fusible pvc water main carrier 1167 lf, D.I. fittings 7075 lf, 12" D.I. restraint gland 72 ea, 12" D.I. restraint gland (joint) 18 ea, concrete water main 20 cuyd, 12" gate valve w/valve box 4 ea, 24" hdpe sdr11 encasement pipe hdd 724 lf.
Release
-
Close
Nov 18, 2025