Retrieving RFP details
Release
Close
Los Angeles, Harbor Dept. (Port of Los Angeles), Purchasing Dept.
Quarterly maintenance develop bas system architecture and network layout coordinate with mechanical/electrical/it teams to integrate all systems produce wiring diagrams, point schedules, and control panel layouts submit detailed submittals and shop drawings for approval provide all necessary bas controllers, sensors, actuators, and interface devices furnish control panels, network switches, and power supplies ensure all equipment is compliant with project specifications and codes install bas components including controllers, wiring, sensors, and control panels integrate with hvac systems (ahus, vavs, chillers, boilers, etc. ), lighting, metering, and other systems as applicable ensure all devices are properly labeled and mounted per standards develop custom control logic sequences for all systems as per design configure user interfaces including graphical floor plans, trend logs, alarms, and schedules provide integration with other systems via bacnet, modbus, lonworks, or other required protocols perform point-to-point verification and functional testing of all bas devices validate system performance against design intent and sequences of operation provide a final commissioning report and assist with third-party commissioning if required provide comprehensive training to facility staff on system use and maintenance. Deliver as-built documentation, including final drawings, o&m manuals, and software backups
RFB 13102 (E-26-0029) C 101525
City of Seguin
HVAC Systems Maintenance, Equipment, Parts, & Services.
Great Plains Regional Office
Requirement to provide 1 year of coverage of the Heating Ventilation and Air Conditioning (HVAC) system and Building Automation System (BAS) for the Main Building, Annex, and the Library Conference Center (LCC).
City of Seguin
Plumbing maintenance, parts, services.
Release
Oct 16, 2025
Close
Nov 07, 2025