Brownwood Independent School District
In general, the project consists of: dirt work, utility work, concrete paving, concrete walks, drilled piers, concrete slabs, structural steel, steel joists, metal deck, single ply roofing, steel studs and drywall, masonry, aluminum, hollow metal doors, aluminum windows, electrical, plumbing, and HVAC. Interior finishes include but are not limited to: steel studs and drywall, epoxy flooring, ceramic tile, paint, acoustical ceiling, millwork, casework, expansion joint covers, marker board, tack boards, projection screens, fire extinguishers and cabinets, toilet partitions, toilet accessories, metal lockers, plaque, identifying devices, and window blinds.
Release
Oct 08, 2024
Close
Oct 31, 2024