Logo

starbridge

Book a Demo
RFPs/Brown St Water Improvements Project

Brown St Water Improvements Project

City of Carrollton

Summary

1,030 LF of new 8" DIP water main; saw-cutting and demolition of existing pavement, drives, and sidewalks as necessary for installation of the water systems; relocation of existing utilities where necessary; pavement, curb, driveway, and sidewalk replacement; re-striping roadway where pavement is replaced to match existing striping; traffic control; erosion control (installation, maintenance, and removal); and permanent stabilization.

Files

202408_supportingdocs_PE-62250-NONST-2025-000000007-2024-08-13_16_45_06-8e449569-1674-4c3f-b735-efc6fb6cf8d2

pdf

Details

Release

Aug 13, 2024

Close

Sep 17, 2024

Contacts

Source

Get a Free RFP Download