County Of Clark
Work consists of the interior build out of an existing warehouse to include a new 7,859 square foot steel framed storage mezzanine, and new floor level office spaces, breakroom, utility rooms, secure storage, equipment storage, new restroom, renovation of existing restroom, and a new fire riser room. Increasing the size of the opening and replacing the existing west overhead door improvements include access control, data, wi-fi, communications and alarm systems. Accommodations for new vehicle lift, compressed air equipment, and designated vehicle storage. Modifications to the existing fire sprinkler system per current code requirements. New storage racking equipment, storage shelving, and storage casework as noted.
Release
Jan 21, 2025
Close
Feb 18, 2025