Retrieving RFP details
Release
Close
Boys & Girls Clubs of Hamilton
Lot renovation.
Knoxville Community Development Corporation
Seeking Construction Manager at Risk (CMAR) for the renovation and expansion of the 7,000 SF existing Boys & Girls Club at KCDC's most recent redevelopment project known as Transforming Western Heights ("Project"). See outside link.
Boys & Girls Clubs of the Ocoee Region
Building renovation. This project is an existing office building built in 1949 and turning it into a Boys and Girls Club (Alteration Level 2). The building is concrete columns and floor slab and roof slab with brick veneer and interior plaster walls.
Hays Unified School District 489
Demolition and removal of the existing portion of the south end of the parking lot. Regrade the area to ensure proper drainage, directing water flow north around existing storage sheds. Install a compacted rock base suitable for concrete paving. Pour and finish approx. 3,700 5500 SF of concrete paving to a depth of 6". (11/13 - corrected from approx. 3,700 to approx. 5500 SF); Provide an asphalt patch to create a seamless transition between the new concrete section and the existing asphalt; Apply new parking lines adjacent to the tennis court fence line. Install parking bumpers/stops to prevent vehicles from impacting the tennis court fence. Perform additional seeding of disturbed areas, if required, upon completion of construction.
City of Springfield
The demolition of the existing boys & girls locker rooms, storage rooms and library and construction of a new library space and break-out classrooms.
Release
Nov 02, 2025
Close
Nov 12, 2025