Yorba Linda Water District
Work includes approx of 1,816 LF of flexible fabric reinforced pipe rehabilitation (FFRP); 550 SF of final paving restoration; 1 EA midpoint connection; 1 EA lower crossover connection; 1 EA upper crossover connection. See outside link.
Release
Sep 30, 2024
Close
Oct 29, 2024