Retrieving RFP details
Release
Close
U.S. Army Engineer District Tulsa
Construction of a 4-dock hangar at AFB. This project constructs a 4-dock hangar for programmed depot maintenance. The facility consists of a single-story structural steel framed hangar bay with full span trusses on a cast-in-place concrete slab. Support spaces include a single-story shop side with a two-story administration side constructed as a steel framed system, including restrooms and lockers, private offices, administrative space, breakroom and FEMA storm shelter, and hazardous material storage space. The hangar bay will be comprised of a standing seam metal roof with the support areas having a low slope single ply membrane roof. Special deep foundations consisting of piers & driven piles are required. Supporting facilities include all necessary utilities and connections, site demolition and earthwork, apron pavements, fencing, and site improvements to provide a complete and useable facility. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facility Criteria 4-010-01. An existing airfield pavement tow-way is being expanded to connect across S Douglas Blvd to the existing airfield.
U.S. Army Engineer District Tulsa
Construction of the FY26 Bomber Agile Common Hangar.
Naples Airport Authority (NAA)
Provide Executive Hangar #4 Lease. The Improved Leasehold Hangar/Facilities consist of (i) one (1) 14,400 SFHangar with approximately 6,547 SF of attached office space; (ii) an Aircraft Apron; (iii) an Automobile Parking Lot; (iv) a 12,000 gallon Self-Fueler; and (v) Other Facilities serving the Hangar (“Other Facilities”).
Chicago-Gary Regional Airport Authority
Work consists of hangar - site work. See outside link.
Release
Jun 24, 2024
Close
Nov 01, 2025