Bois Forte Band of Chippewa
1.Interior Wet Rehabilitation (a)Complete removal and replacement of protective coating system. 2.Exterior Rehabilitation, (a)Complete removal and replacement of protective coating system with full curtain containment and fitted bonnet, (b)New tower lettering/logos. 3.Interior Dry Rehabilitation, (a)Complete removal and replacement of protective coating system. 4.Miscellaneous grinding, welding, and caulking. 5.New pressure relief “frost-free” roof vent. 6.New 24” pressure access manway. 7.New tank mixer with control panel. 8.New drain “mud” valve. 9.Provide two “pressure relief” valves in water system. 10.New aviation obstruction light with pivoting post. 11.Welding modifications, (a)Overflow pipe, (b)Modify and seal upper landing, (c)Repair damaged ladder, (d)Remove existing cathodic protection system. 12.Repair concrete and grout under base ring. 13.New pressure manway gaskets. 14.New recirculation pump, piping, temperature sensor, flow indicator, and all new inlet/outlet pipe valves, sample tap. 15.New safety climb equipment/systems. 16.New valve room heaters. 17.Install pipe insulation and heat tape to misc. piping together with numerous related items of work, all in accordance with Plans and Specifications.
Release
Dec 23, 2024
Close
Jan 23, 2025