Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Ottumwa Housing Authority
Installation of two (2) modular boiler units, which will replace current hot water heaters. Hot water boilers must be fueled with natural gas. Emergency stop access is necessary at all times. Ability to safely disconnect from current system is required.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Genesee Intermediate School District
Replacement of the boilers and chillers.
Posted Date
Nov 16, 2025
Due Date
Dec 11, 2025
Release: Nov 16, 2025
Genesee Intermediate School District
Close: Dec 11, 2025
Replacement of the boilers and chillers.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Vermont Agency of Administration
Provide Construction Management Services for the Summer Boiler and Boiler Renovations Project. The primary objective of this project is to address installing new boiler(s) to serve the summer load of the Vermont Agricultural and Environmental Laboratory, which is served by the State University, Randolph heat plant located in the Facilities Center. The heat to the college campus is shut off during the summer months, typically mid-May to mid-October. This project shall provide Construction Management services for the installation of new #2 oil boiler(s) sized for summer use, initially fed from a temporary fuel oil tank. The conversion of the existing oil boilers from #4 fuel oil to #2 fuel oil, and the replacement of the existing underground oil tanks. The conversion of the existing boilers and replacement of the fuel tanks to occur during the summer and be substantially complete by mid-October 2026.
Posted Date
Nov 26, 2025
Due Date
Dec 29, 2025
Release: Nov 26, 2025
Vermont Agency of Administration
Close: Dec 29, 2025
Provide Construction Management Services for the Summer Boiler and Boiler Renovations Project. The primary objective of this project is to address installing new boiler(s) to serve the summer load of the Vermont Agricultural and Environmental Laboratory, which is served by the State University, Randolph heat plant located in the Facilities Center. The heat to the college campus is shut off during the summer months, typically mid-May to mid-October. This project shall provide Construction Management services for the installation of new #2 oil boiler(s) sized for summer use, initially fed from a temporary fuel oil tank. The conversion of the existing oil boilers from #4 fuel oil to #2 fuel oil, and the replacement of the existing underground oil tanks. The conversion of the existing boilers and replacement of the fuel tanks to occur during the summer and be substantially complete by mid-October 2026.
AvailableArgo Community High School District
Provide and implement a district-wide telephone system replacement. The RFP outlines system requirements, installation scope, and ongoing support expectations. See attached file.
Posted Date
Oct 24, 2025
Due Date
Dec 2, 2025
Release: Oct 24, 2025
Argo Community High School District
Close: Dec 2, 2025
Provide and implement a district-wide telephone system replacement. The RFP outlines system requirements, installation scope, and ongoing support expectations. See attached file.
AvailableTexas Department of Transportation
The Texas Department of Transportation issued RFP #5514 for Firewall Replacement & Installation Services to replace and install perimeter firewall infrastructure. The posting on the BidPrime detail page is shown as open with referenced documents (Fire-Specs and Fire-Planholders) that require access via the aggregator.
Posted Date
Oct 17, 2025
Due Date
Dec 1, 2025
Release: Oct 17, 2025
Texas Department of Transportation
Close: Dec 1, 2025
The Texas Department of Transportation issued RFP #5514 for Firewall Replacement & Installation Services to replace and install perimeter firewall infrastructure. The posting on the BidPrime detail page is shown as open with referenced documents (Fire-Specs and Fire-Planholders) that require access via the aggregator.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →