Van Buren Intermediate School District
Provide installation of a boiler and related system components; installation of isolation valves in existing hydronic piping from main heating system to greenhouse; installation of new 500,000btu, modulating, condensing boiler with isolation valves in existing hydronic supply lines to the greenhouse space; install venting through roof with all necessary penetrations and proper sealing of penetrations; connect to gas line on the roof with all necessary penetrations and proper sealing of penetrations. See attached file.
Bid Packet Boiler - Van Buren Tech - October 2024
Release
Oct 01, 2024
Close
Oct 15, 2024