Retrieving RFP details
Release
Close
Township of Upper Providence
Supply and install a Highland Fireguard HT-1105 15,000 gallon split compartment, 10,000 gallon gasoline and 5,000 gallon diesel, fuel tank with Teir 2 HL-87 fuel dispensing systems, HT-6121 Authentication Devices, and HT-6105 High-Link Software Application or approved equal. Project includes the construction of a reinforced concrete pad to support fuel tank and fuel dispensing equipment, installation of underground electrical conduit(s) by open trench in lawn areas and directional drilling under existing paved areas, extension of an eight-inch watermain, relocation of the existing water main blow-off valve system, storm sewer system extension. and the extension of a paved drive with a cul-de-sac turnaround with concrete curb. The work also includes the excavation and/or placement and compaction of fill material to bring the site to grade, loading and hauling excess material to an on-site stockpile next to the work area, and placement of topsoil, and final grading. Work also includes temporary erosion and sedimentation controls during construction and site stabilization activities of all disturbed areas with seed and mulch, and removal and proper disposal of construction debris and rubble.
Black Rock Fuel Station
zip
Township of Upper Providence
Supply and install a highland fireguard HT1105 15,000 gallon split compartment, 10,000 gallon gasoline and 5,000 gallon diesel, fuel tank with teir 2 HL-87 fuel dispensing systems, HT-6121 authentication devices, and HT-6105 high-link software application or approved equal. Project includes the construction of a reinforced concrete pad to support fuel tank and fuel dispensing equipment, installation of underground electrical conduit(s) by open trench in lawn areas and directional drilling under existing paved areas, extension of an eight-inch watermain, relocation of the existing water main blow-off valve system, storm sewer system extension. and the extension of a paved drive with a cul-de-sac turnaround with concrete curb. The work also includes the excavation and/or placement and compaction of fill material to bring the site to grade, loading and hauling excess material to an on-site stockpile next to the work area, and placement of topsoil, and final grading. Work also includes temporary erosion and sedimentation controls during construction and site stabilization activities of all disturbed areas with seed and mulch, and removal and proper disposal of construction debris and rubble.
City of Palm Beach Gardens
Convenience store and fuel station. Construction of a one story, 4,600 SF convenience store building.
Pebble Beach Community Services District
Work consists of rehabilitating a wastewater pump station.
Release
Oct 02, 2025
Close
Nov 12, 2025