Sciences Po Uc Berkeley Dual Degree
Renovation of labs b131 and b165. Install new 4-pipe fan coils, humidifiers, and upgrade building automation controls (BAS) for these zones. New systems installed for tight temperature and humidity control.
16257A_AD_Birge Hall Suleymanzade Lab Renovation_2025-04-08
Release
Apr 08, 2025
Close
Apr 29, 2025