Alabama Community College System
Construction of a concrete slab on grade with integral footings with plumbing and electrical rough in included. A pre-engineer metal building frame will then be erected on this slab to include metal roofing panels and selected areas of metal building wall panels.
Release
Jun 14, 2025
Close
Jun 24, 2025