Retrieving RFP details
Release
Close
Kentucky Transportation Cabinet
Work consists of 350 TN, DGA base; 111 TN, leveling & wedging pg64-22; 1,130 TN, CL2 asphalt surface 0.38D PG64-22; 10 TN, asphalt material for tack; 270 SF, temporary signs; 45 TN, asphalt pave milling & texturing; 115 SY, base failure repair; 3,000 LF, pave striping-temp paint-4 IN; 16,400 LF, pave striping-perm paint-4 IN. See attached files.
KY 1 @ East Carter High School Intersection
zip
Kentucky Transportation Cabinet
Work includes: 144 TN, leveling & wedging pg64-22; 795 TN, CL2 asphalt surface 0.38D PG64-22; 8 TN, asphalt material for tack; 96 SF, temporary signs; 25 TN, asphalt pave milling & texturing; 5,000 LF, pave striping-temp paint-4 IN; 13,100 LF, pave striping-perm paint-4 IN; 1 LS, demobilization. See attached files.
Kentucky Transportation Cabinet
Work consists of 160 TN, leveling & wedging pg64-22; 1,600 TN, CL2 asphalt surf 0.38B PG64-22; 128 SF, temporary signs; 1 LS, maintain & control traffic; 5 TN, asphalt pave milling & texturing; 29,600 LF, pave striping-temp paint-4 IN; 29,600 LF, pave striping-perm paint-4 IN; 16 TN, asphalt material for tack non-tracking. See attached files.
Kentucky Transportation Cabinet
Project consists of 508 TN, leveling & wedging pg64-22; 3,630 TN, CL2 asphalt surf 0.38D PG64-22; 590 SF, temporary signs; 100 TN, asphalt pave milling & texturing; 47,000 LF, edgeline rumble strips; 1,055 SY, base failure repair; 20,000 LF, pave striping-temp paint-4 IN; 50,000 LF, pave striping-thermo-6 IN W; 30,000 LF, pave striping-thermo-6 IN Y; 16,166 DOL, asphalt adjustment. See attached files.
Release
Oct 30, 2025
Close
Nov 20, 2025