Orange County Sanitation District
Work consist of replace the existing bay bridge pump station and replace the existing force mains with two 24" diameter force mains, installing two 24" HDPE force mains inside a 72" reinforced concrete casing pipe installed, additional property adjacent to the existing pump station property to build the new pump station. The new pump station will include vapor- phase and liquid-phase odor control systems and a permanent standby generator, demolition of the existing pump station and abandonment of existing force mains.
20240801090803880 5-67 Construction Project Outreach and Request for Interest
Release
Sep 30, 2024
Close
Dec 05, 2024