City of Pearland
The Barry Rose WRF and Longwood Project includes an expansion to the existing Barry Rose Facility including a new Headworks Building, Odor Control System, 6-Train Sequence Batch Reactor, SBR Filtration, UV Disinfection, Chlorine Chemical and Non-Potable improvements, Aerated Sludge Holding Basins and a New Dewatering Building. The Longwood Facility plant includes complete plant decommissioning and a new pump station to divert all flow from Longwood to Barry Rose. GMP2 includes all scopes of work on these two Facilities not previously bid out with GMP1 package (SBR Basin Concrete, Partial Civil/Site Work & Electrical/Equipment). Longwood Facility; Solids Handling; Liquid Train (Process, Structural, Civil, Misc. Metals); Landscaping; Site Precast Fencing; Chainlink Fencing; Paving; Sunken Caisson; Masonry; Structural Steel; Interior Architectural Woodwork & Stone Countertops; Damproofing & Waterproofing; Roofing; Joint Protection; Doors and Frames; Overhead Coiling Doors; Windows & Glazing; Plaster and Gypsum Board/Acoustical Ceiling; Tiling & Flooring; Architectural Painting & Coatings; Protective Coatings; Concrete Protective Coatings; Div. 10 Specialties & Aluminum Canopies; Lab Equipment; Signage; Pre-Fab Buildings; HVAC; Plumbing; Electrical; Instrument and Controls Integration Package; Piping Insulation; n Fabricated Piping; Piping; Process Equipment for SP; Odor Control Equipment; Re-Aeration System Diffusers.
Release
Aug 24, 2024
Close
Oct 03, 2024