Logo

starbridge

Book a Demo
RFPs/Bake Parkway and Irvine Blvd./trabuco Rd. Street Improvements (RFB)

Bake Parkway and Irvine Blvd./trabuco Rd. Street Improvements (RFB)

City of Lake Forest

Summary

Work includes 3500 LF of remove and dispose existing pcc curb & gutter, 7770 SF of remove and dispose existing sidewalk & curb ramp, 1 EA of remove and dispose of existing tree, 22070 SF of remove and dispose asphalt concrete pavement & base material, 4000 SF of remove and dispose concrete median paving, 300 CY of excavate and export existing soil, 7343 SF of construct 4" thick pcc sidewalk, 17345 SF of place ac pavement, 1 LS of construct ada ramp w/ 4" curb and handrails (private), 1 LS of sawcut and join existing walkway. See attached file.

Files

bulk

zip

Details

Release

Oct 01, 2024

Close

Nov 06, 2024

Contacts

Source

Get a Free RFP Download