City of Lake Forest
Work includes 3500 LF of remove and dispose existing pcc curb & gutter, 7770 SF of remove and dispose existing sidewalk & curb ramp, 1 EA of remove and dispose of existing tree, 22070 SF of remove and dispose asphalt concrete pavement & base material, 4000 SF of remove and dispose concrete median paving, 300 CY of excavate and export existing soil, 7343 SF of construct 4" thick pcc sidewalk, 17345 SF of place ac pavement, 1 LS of construct ada ramp w/ 4" curb and handrails (private), 1 LS of sawcut and join existing walkway. See attached file.
bulk
zip
Release
Oct 01, 2024
Close
Nov 06, 2024