Retrieving RFP details
Release
Close
Missouri Office of Administration
Project includes the replacement of existing generator with new. Replacement of existing day tank with new. Replacement of existing backup power switchgear with new. Replacement of existing automatic transfer switch with new, and the installation of a new mobile generator connection tap box.
C2415-01 IFB
City of Gardner
Seeking a licensed contractor to remove our existing diesel backup generator system and install a new caterpillar c13 generator and asco c300 automatic transfer switch. Safely disconnect and remove the existing generator and associated components. Properly dispose of equipment in compliance with all applicable environmental and safety regulations. Remove bollards as needed (bollards to be saved for reinstallation by city). Evaluate the site and prepare for the installation of new equipment. Install a new caterpillar c13 generator system provided by foley equipment. Install new concrete pad as required for new generator system. See outside link.
NAVFAC Mid-Atlantic
Provide Design-build (DB), Replace Backup Power Generation.
North Carolina State University At Raleigh
Work includes to add full-building backup power to communication technologies, which serves as the provider for voice, video, and data network infrastructure that includes designing, maintaining, and supporting the campus network, as well as providing phone, cable television and wireless internet.
Release
Oct 25, 2025
Close
Dec 02, 2025