City of Commerce City
Procurement of generators and associated electrical gear, installation of generator including concrete pad of sufficient strength and size for the generator, trenching primary electrical lines, repair of existing surfaces effected by installation, and obtaining all necessary permits. Contractor is required to maintain sidewalk widths per ADA, if new electrical gear protrudes into the egress paths then contractor is responsible for providing new path design that will be reviewed by city staff, if approved then contractor must provide new path.
Release
Aug 17, 2024
Close
Sep 13, 2024