Retrieving RFP details
Release
Close
City of Aztec
Demolition of existing retaining walls, earthwork for regarding the site for access around the new clearwell and existing pond, excavation for a new 10' deep clearwell, construction of new concrete retaining walls for site grading, construction of a new concrete 11,300 CF clearwell to be tied into the existing clearwell, including construction to reroute flow in the existing clearwell, and construction of concrete sitework.
City of Aztec
Water treatment facility clearwell expansion.
City of Newberry
Wastewater treatment facility (WWTF) expansion.
City of McCall
The work of this contract generally includes construction of water treatment plant expansion consisting of two deep bed dual media filters, pipe gallery, electrical gear upgrades, underground concrete disinfection contact basin, and associated site piping modifications. These improvements will include excavation, subgrade preparation, and construction of a facility expansion as well as the installation of various site piping, butterfly valves, and associated fittings, electrical gear, filter control panel and associated valves and instrumentation, and associated site electrical work, underground concrete disinfection contact basin, and site restoration and seeding.
Release
Oct 14, 2025
Close
Nov 17, 2025