High Desert Corridor Joint Powers Authority
Provide all supervision, labor, equipment, materials, and transportation necessary to complete the project that includes the grading, furnishing and installing eight (8) permanent shade structures, installing concrete and decomposed granite, and various landscape repairs within the park.
01-Ayala Park Shade Structure Project - Section A - Bidding Requirements
Southgate Recreation & Park District
Work consists of site demolition, clearing, grubbing, and small tree removal, rough and finish grading, installation of conduits, pull boxes, and grounding system for future electrical and shade structure improvements, installation of minor landscape drain, concrete flatwork, stamped concrete flatwork, concrete curb and gutter, and concrete curbing, asphalt paving, accessible parking signage, striping.
Clovis Unified School District
Work consists of high school - shade structure addition.
Mountain View School District
Work includes mechanical, electrical or plumbing.