Logo

starbridge

Book a Demo
RFPs/Green Bay Trail, and Crow Island Woods Park Drive Asphalt Paving

Green Bay Trail, and Crow Island Woods Park Drive Asphalt Paving

Winnetka Park District

Summary

Work includes repair existing asphalt, to include, as needed: surface preparation, sawcutting, asphalt removal, removal of tree roots or vegetation, gravel base installation, prime coat installation, and binder and/or surface course patching. Stripe parking spaces and install arrows, crosshatching, traffic lanes, stop stripes, and symbols. Repair any catch basins shown on the drawings, including, but not limited to, rebuilding broken basin walls, adjusting rim elevations, repairing broken or improperly sealed/grouted adjacent drain lines, and adjusting settled basins. Grind/mill any areas shown on the drawings, including proper removal of all ground/milled materials from site.

Files

Asphalt Paving

zip

Details

Release

Apr 22, 2025

Close

May 08, 2025

Contacts

Source

Get a Free RFP Download