Retrieving RFP details
Release
Close
City of Mobile
The replacement of chiller #3. In order to replace chiller #3, Chiller #2 will need to be disconnected and shifted to allow room for the chiller to pass by, then be reconnected. Additionally, the three chilled water pumps and three condenser water pumps are to have VFD’s installed on the existing pumps.
Arthur R
Outlaw Convention Center - Mechanical Improvements
Massachusetts Convention Center Authority
Low Slope Mechanical Roof.
Baltimore County Public Schools
Work included mechanical systemic and open space improvements.
Sikeston R-6 School District
Provide renovations and improvements to the career and technology center. Bid packages include demolition, concrete, masonry, sheet metal, painting, flooring, doors, frames, hardware, pre-engineered metal building restoration, casework, fire suppression, plumbing, mechanical, electrical line and low voltage, paving, and other work as may be required.
Release
Oct 06, 2025
Close
Dec 03, 2025